|
. | . |
|
by Staff Writers Kourou, French Guiana (ESA) Sep 02, 2015
Europe's ninth and tenth Galileo satellites have been attached to the dispenser that will hold them during their flight up into space, then release them into their planned orbits. Galileo 9 and 10 are due for launch atop a Soyuz rocket at 02:08 GMT on 11 September (04:08 CEST; 23:08 local time, 10 September) from Europe's Spaceport in French Guiana. Fuelled the previous week, the two 715 kg satellites were carefully lowered and attached to the dispenser structure in turn. The process during 27-28 August in the space centre's 3SB preparation building went smoothly. To avoid any snags, the Galileos had previously undergone a 'fit check' with the dispenser at the very start of the launch campaign in late July. The dispenser, custom-designed to hold Galileo pairs for Arianespace by Ruag Space Sweden, will carry the satellites for a total of 3 hr 48 min during ascent to the medium-altitude orbit. Then, once the Fregat upper stage reaches the set 23 222 km altitude and 57.394 inclination, the dispenser performs its second crucial role: firing a pyrotechnic separation system to release them in opposing directions. The next major step in the launch campaign is to attach the combined satellites plus dispenser to Fregat, which arrived in the 3SB building on Tuesday, 2 September, already fuelled and ready. Once attached, the satellites plus Fregat will then be encapsulated within the launcher fairing, after which this 'upper composite' can then be attached to the other three stages of the Soyuz ST-B. As much a spacecraft as a launcher stage, the reignitable Fregat will take the Galileos the bulk of the way to their designated orbit once the first three stages of the Soyuz achieve low orbit, some 9 min 24 sec after launch. A pair of Fregat firings will be separated by a 3 hr 13 min coast. This latest Galileo launch campaign began with the arrival of the satellites in French Guiana on 24 July. Two further satellites are scheduled for launch by end of this year. One is under test at ESA's ESTEC technical centre in Noordwijk, the Netherlands, while the other has already completed its checks and is awaiting transportation to Kourou in the second half of October. In addition, the first satellite of the following batch (Galileo 13) has arrived at ESTEC and is undergoing its thermal-vacuum test. The next will arrive by mid-September.
Related Links Galileo at ESA GPS Applications, Technology and Suppliers
|
|
The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement All images and articles appearing on Space Media Network have been edited or digitally altered in some way. Any requests to remove copyright material will be acted upon in a timely and appropriate manner. Any attempt to extort money from Space Media Network will be ignored and reported to Australian Law Enforcement Agencies as a potential case of financial fraud involving the use of a telephonic carriage device or postal service. |