Subscribe free to our newsletters via your
. GPS News .




GPS NEWS
Galileo duo handed over in excellent shape
by Staff Writers
Paris (ESA) Oct 17, 2014


Artist's view of one of the first two Galileo Full Operational Capability satellites. The first two Galileo Full Operational Capability satellites (satellites 5-6) were launched together aboard a Soyuz rocket from Europe's Spaceport in French Guiana on 22 August 2014, joining the four Galileo satellites already in orbit. These satellites are significant as the first of the rest of the Galileo constellation. The definition, development and in-orbit validation phases of the Galileo programme were carried out by ESA and co-funded by ESA and the EU. Image courtesy ESA-J. Huart, 2014.

A pair of fully functioning Galileo navigation satellites was recently delivered to its operators, as preparations get underway for the next round of launches.

On 27-28 September, the two satellites launched on 22 August were handed over from ESA's Space Operations Centre, ESOC, in Darmstadt, Germany, to the Galileo Control Centre, Oberpfaffenhofen, which will care for them pending a final decision on their use.

The satellites are in excellent health and working normally. A launcher problem left the pair in the wrong orbit, with higher apogee, lower perigee and an incorrect inclination compared to the planned circular orbit.

Training for challenges
The orbit presented a sudden and unexpected - though not untrained for - challenge to the team at ESOC responsible for the launch and early orbit phase.

For months before each Galileo launch, a joint team of mission operations experts from ESA and France's CNES space agency train intensively for this critical period, which typically lasts about eight days, from separation until handover to Oberpfaffenhofen.

"After launch, we quickly discovered that one of each satellite's pair of solar wings had not deployed correctly," says Liviu Stefanov, Spacecraft Operations Manager. "At the same time, difficulties in receiving radio signals - indicated by unusually low power and instability - alerted us to the fact that the orbits could be incorrect.

"Basically, the ground stations were pointing to where we expected the satellites to be, and they weren't there, so we weren't getting good signals."

Quick teamwork to find satellites
Engineers determined within four hours the approximate actual orbit and then generated new commands to point the ground antennas to establish robust radio links.

Working around the clock, and with assistance from the Galileo project engineers and the satellite builder, the teams then started to look at how to free the solar arrays.

"Each undeployed wing had to be treated as a separate problem," says Flight Operations Director Herve Come.

"Each satellite had to be manoeuvred separately into an orientation where the undeployed panel was facing the Sun because we realised that one cause was linked to the low temperature of the release mechanism.

"It all required developing, validating and rehearsing new flight operation procedures 'on the fly'."

It took three days to release the trapped solar wing of the first satellite, and then two days later the second Galileo's stuck array was also freed.

The satellites have since been brought into full operation, as the teams in Darmstadt were tasked to retain control for five weeks - four weeks longer than planned.

Strong bonds developed through months of joint training
"This was very demanding on the ESA and CNES personnel, and on the ESOC operations team in particular, but the strong bonds developed through months of joint training enabled them to perform very well," says Liviu.

Possible uses of the two satellites are now being studied and a future mission scenario will be decided at a later date.

While handing over the satellites to the Galileo Control Centre, where they are operated by teams from a private company, spaceopal GmbH, had been practised in the past, this was the first time it was done with Full Operational Capability satellites in orbit.

The delicate process involves transferring responsibility for commands and telemetry, and beginning the satellites' 'secure mode' of operation by the teams at Oberpfaffenhofen. The handover ran very smoothly over the last weekend in September.

Extremely proud of entire team
"By the end of the Saturday, the first satellite was fully handed over, while the second handover took place on Sunday," says Richard Lumb, ESA's Galileo Mission Director.

"I am extremely proud of the entire Mission Control Team and the way they handled a dramatic and very critical situation resulting from multiple, independent anomalies," says Paolo Ferri, ESA's Head of Mission Operations.

"After launch, the joint team managed to maintain control of the satellites under extremely difficult conditions, rapidly stabilised them and determined the actual orbit."

"The accuracy and professionalism of the subsequent handover activities also showed that the joint team at ESOC and the spaceopal team at the Galileo Control Centre are very well 'tuned' for this procedure, which will become increasingly frequent with future launches."

.


Related Links
ESA Operations
GPS Applications, Technology and Suppliers






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








GPS NEWS
With IRNSS-1C, India a Step Closer to Own Navigation Satellite System
Bangalore, India (SPX) Oct 17, 2014
India Thursday moved closer towards having its own satellite navigation system as it successfully launched a satellite with its rocket in a copy book style.With the successful launch of third of the seven satellites planned under the Indian Regional Navigation Satellite System (IRNSS) early Thursday, India moved nearer to a select group of space-faring nations having such a system. The country i ... read more


GPS NEWS
Building a bridge from basic botany to applied agriculture

Stomping out grape disease one vineyard at a time

Plant communities produce greater yield than monocultures

Are there enough fish to go around?

GPS NEWS
Australian teams set new records for silicon quantum computing

A novel platform for future spintronic technologies

Wider product lineup lifts Intel profit, revenues

NIST quantum probe enhances electric field measurements

GPS NEWS
Australia's Tiger armed recon helicopters getting upgrade

Maintenance, upgrade work on Italian aircraft carrier ahead of schedule

New Zealand updating Super Seasprite helicopter training systems

Jordanian Air Force helicopter pilots to train on Robinson aircraft

GPS NEWS
Tritium targets Europe for its EV fast charger

Dongfeng, Huawei partner for Internet-enabled cars

Volvo says will recruit 1,300 in Sweden as sales boom

Hailo taxi app folds in US, looks to Europe and Asia

GPS NEWS
Social trust eroded in Chinese product-tampering incident

Virtual currency founder pleads not guilty in New York

Australia fast-tracks visas for super rich

Romania lifts immunity for ex-minister in Microsoft probe

GPS NEWS
Sean Parker to pay fines and build app for Big Sur wedding damages

First Detailed Map Of Carbon Stocks In Mexico Forests Unveiled

Climate change not responsible for altering forest tree composition

Three Cambodian log traders charged over journalist murder

GPS NEWS
NASA Tool Helps Airliners Minimize Weather Delays

Sophisticated Sensor Will Give NOAA Earlier Warnings of Severe Storms

Chinese scientist proposes new scientific satellites

NASA Begins Sixth Year of Airborne Antarctic Ice Change Study

GPS NEWS
Electric charge along microbial nanowires imaged

Nanoparticles Break the Symmetry of Light

DNA nano-foundries cast custom-shaped metal nanoparticles

Smallest world record has 'endless possibilities' for bio-nanotechnology




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement All images and articles appearing on Space Media Network have been edited or digitally altered in some way. Any requests to remove copyright material will be acted upon in a timely and appropriate manner. Any attempt to extort money from Space Media Network will be ignored and reported to Australian Law Enforcement Agencies as a potential case of financial fraud involving the use of a telephonic carriage device or postal service.